As they likely put it, 4chan isn't your personal army.
Facebook is where they all interact and combine their stupidity into groups. Over on YouTube they show how angry they get when reality doesn't match what is in their head. And apparently on Twitter:
http://www.google.com/search?q=nuclear&hl=en&safe=off
They show just how ignorant they are without being too offensive.
Such as:
"LauraVanVleet RT @NoNewNukes: Tell the President that there should be no taxpayer giveaways for #nuclear power"
"shpilk "Too cheap to meter". Yeah. Right. #nuclear #faustianbargain. ALL technology is potentially fallible. Will we learn from this? Hell no."
And everyone's whale boat ramming favorite:
"Greenpeace USA Tell the President and your members of Congress that there is no place for taxpayer giveaways to the nuclear industry in this year's budget."




Reply With Quote






<- can someone please make this as a repro and sell it so me? 








Press Release (Mar 13,2011)
There is no update from the release issued at 1:00 am Unit 1 (shut down at 2:48pm on March 11th) - Reactor is shut down and reactor water level is stable. - Offsite power is available. - At 8:19am, there was an alarm indicating that one of the control rods was not properly inserted, however, at 10:43am the alarm was spontaneously called off. Other control rods has been confirmed that they are fully inserted (reactor is in subcritical status) - Status of main steam isolation valve: closed - Injection of water into the reactor is done by Make-up Water Condensate System. - At 6:08pm, we announced the increase in reactor containment vessel pressure, assumed to be due to leakage of reactor coolant. However, we do not believe there is leakage of reactor coolant in the containment vessel at this moment. - At 5:22am, the temperature of the suppression chamber exceeded 100 degrees. As the reactor pressure suppression function was lost, at 5:22am, it was determined that a specific incident stipulated in article 15, clause 1 has occurred. - We decided to prepare implementing measures to reduce the pressure of the reactor containment vessel (partial discharge of air containing radioactive materials) in order to fully secure safety. This preparation work started at around 9:43am and finished at 6:00pm. - Restoration work in reactor cooling function is in progress to achieve reactor cold shutdown. Unit 2 (shut down at 2:48pm on March 11th) - Reactor is shut down and reactor water level is stable. - Offsite power is available. - Control rods are fully inserted (reactor is in subcritical status) - Status of main steam isolation valve: closed - Injection of water into the reactor is done by Make-up Water Condensate System. - We do not believe there is leakage of reactor coolant in the containment vessel. - At 5:32am, the temperature of the suppression chamber exceeded 100 degrees. As the reactor pressure suppression function was lost, at 5:32am, it was determined that a specific incident stipulated in article 15, clause 1 has occurred. - We decided to prepare implementing measures to reduce the pressure of the reactor containment vessel (partial discharge of air containing radioactive materials) in order to fully secure safety. This preparation work started at around 10:33am and finished at 10:58pm. - Restoration work in reactor cooling function is in progress to achieve reactor cold shutdown. Unit 3 (shut down at 2:48pm on March 11th) - Reactor is shut down and reactor water level is stable. - Offsite power is available. - Control rods are fully inserted (reactor is in subcritical status) - Status of main steam isolation valve: closed - We do not believe there is leakage of reactor coolant in the containment vessel. - We decided to prepare implementing measures to reduce the pressure of the reactor containment vessel (partial discharge of air containing radioactive materials) in order to fully secure safety. The preparation woke started at around 12:08pm and finished at 12:13pm. - Reactor cold shutdown at 12:15pm Unit 4 (shut down at 2:48pm on March 11th) - Reactor is shut down and reactor water level is stable. - Offsite power is available. - Control rods are fully inserted (reactor is in subcritical status) - Status of main steam isolation valve: closed - Injection of water into the reactor is done by Make-up Water Condensate System. - We do not believe there is leakage of reactor coolant in the containment vessel. - In order to cool down the reactor, injection of water into the reactor had been done by the Reactor Core Isolation Cooling System, however, At 6:07am, the temperature of the suppression chamber exceeded 100 degrees. As the reactor pressure suppression function was lost, at 6:07am, it was determined that a specific incident stipulated in article 15, clause 1 has occurred. - We decided to prepare implementing measures to reduce the pressure of the reactor containment vessel (partial discharge of air containing radioactive materials) in order to fully secure safety. The preparation woke started at around 11:44am and finished at around 11:52am. - Restoration work in reactor cooling function is in progress to achieve reactor cold shutdown. Indication from monitoring posts installed at the site boundary did not show any difference from ordinary level. No radiation impact to the external environment has been confirmed. We will continue to monitor in detail the possibility of radioactive material being discharged from exhaust stack or discharge canal.

Bookmarks